Since 1969, Telar Engenharia has built a solid legacy, marked by major projects, innovation, and a strong commitment to technical excellence. Discover our history, values, leadership, and the milestones that have made Telar a benchmark in engineering in Brazil and Latin America.

SABESP :: Integra Tietê Project – Packages 21 and 18A

Execution of wastewater removal and collection works in the Municipality of Barueri, left bank of the Tietê River, under the Integra Tietê program, Packages 21 and 18A by Sabesp in São Paulo – SP

2024

WTP Barranquilla :: Colombia

Construction of the regional water transmission system for the northern district of Barranquilla and the municipality of Puerto Colombia, Department of Atlántico – Colombia

2024

METRÔ Paulista

Construction of a pedestrian access tunnel between Lines 2 and 4 of the São Paulo Metro – SP

2022

CAGECE :: Fortaleza

Sanitary sewage system in several sub-basins in Fortaleza – CE

Read More
2021

CPTM :: Linha 13

Implementation works of Overhead Traction Network, Permanent Way, Signaling, and Electrical Systems in the city of São Paulo – SP

2021

COHAB PPP :: Social Housing Lot 4

Public-private partnership (PPP) contract for the construction of 1,100 social housing units in the Ipiranga area, in the city of São Paulo, Brazil

Nov 09, 2017

SABESP :: Franca

Pipeline system and sludge treatment plant in the city of Franca, in the State of São Paulo, Brazil

2020

BROOKFIELD :: João Dias Station Line 9 CPTM

Construction of the new João Dias station on CPTM Line 9

2019

CPTM :: Francisco Morato Station

Construction of Francisco Morato Station on CPTM Line 7, in São Paulo, SP

2017

CEDAE :: Nova Iguaçu - RJ

Implementation works of the Water Supply System in the Cabuçu area, in Nova Iguaçu – RJ

2015

SABESP :: ITI 7 and ITA 1J

Execution of the sewage interceptor works ITI 7 – Tietê River and ITA 1J – Tamanduateí River, as part of the Tietê River Clean-up Program (Phase III), in São Paulo – SP

2010

EMBASA :: Paulo Afonso

Execution of sanitary sewage works in the city of Paulo Afonso – BA

2007

IMM Montevideo :: Artega Network

Execution of the rehabilitation and expansion works of the sewage network (Artega Network) in the city of Montevideo – Uruguay

2003

SABESP :: IPI6

Construction of the sewage interceptor along Marginal Pinheiros, in São Paulo – SP

2000

EMBASA :: Alto Camurugipe System

Construction of the sanitation system for the Alto Camurugipe area, in Salvador - BA

1997

PMSP :: Aricanduva Stream

Execution of the channeling works for the Aricanduva Stream, in São Paulo - SP

1994

METRÔ :: Clínicas Station

Construction of a pedestrian tunnel at Clínicas Station of the São Paulo Metro - SP

1987

CBTU :: Ribeirão Pires

Infrastructure recovery works between Ribeirão Pires and Mauá, in São Paulo - SP

1986

PMSP :: Tiquatira Stream

Execution of the channeling works for the Tiquatira Stream, in the city of São Paulo - SP

1978

PM Jacareí

Construction of the City Hall building of Jacareí, in the city of Jacareí - SP

1969

TELAR ENGINEERING FOUNDATION

Company founded by Polytechnic Engineer Ariovaldo Botter

2025

METRÔ :: Line 15

Supply and implementation of telecommunications and control systems at the Ipiranga, Boa Esperança, Jacu Pêssego stations, Ragueb Chohfi Yard, and track segments of Line 15 – Silver of the São Paulo METRÔ – SP

2023

METRÔ São Joaquim Station

Execution of civil works, system implementation, and adaptation of the São Joaquim Station on Line 1 – Blue for connection with Line 6 – Orange of the São Paulo Metro – SP

2024

SEDURB :: Vila Velha

Construction of a dike gallery and linear park along the Marinho Canal in Vila Velha – ES

Nov 09, 2017

CAGECE :: Juazeiro do Norte

Expansion and implementation of a Measurement and Control District in the Water System of Juazeiro do Norte – CE

2021

C290 :: Real Estate Development

Development of a 21-story residential building in the Vila Mascote district of São Paulo, Brazil

2021

CPTM :: Permanent Way and Overhead Line – Line 9

Implementation of permanent way and overhead line at João Dias Station, CPTM, in the city of São Paulo, Brazil

Read More
2020

EAAB :: Colombia

Relocation of the sewage network in the city of Bogotá, Colombia

2020

COHAB PPP :: Social Housing Lot 5

Public-Private Partnership (PPP) contract for the construction of 2,760 social housing units in the Moóca and Tatuapé districts, in the city of São Paulo, SP

2017

CPTM :: Signaling and Telecommunications

Implementation works of the signaling and telecommunications system of CPTM Line 9 – São Paulo, SP

2016

METRÔ :: Line 5

Finishing works at Alto da Boa Vista and Borba Gato Stations of São Paulo Metro Line 5 – SP

2015

PRODESP :: Poupatempo System Units

Poupatempo system units – contract for the construction, renovation, adaptation, and public service in units located in the cities of Marília and Caraguatatuba, in the State of São Paulo – SP

2008

SABESP :: Praia Grande

Execution of the sanitary sewage system works for the Onda Limpa Program in Praia Grande – SP

2004

CPTM :: Luz Station

Execution of the Operations Control Center (OCC) and interconnection between the Metro and CPTM stations in the Luz Station area, in São Paulo – SP

2002

SP Vias :: São Paulo State Department of Transportation

Highway concession agreement to operate 516 km, covering sections of Castello Branco, Raposo Tavares, João Mellão highways, among others. Concessionaire: SPVias

1999

DAEM :: Water and Sewerage Department of Marília

Águas de Marília Concession – concession contract for a water production plant in Marília, State of São Paulo - SP

1995

PMSP :: Jaguaré Stream

Reinforcement gallery for the canalization of the Jaguaré Stream, construction of Escola Politécnica Avenue and removal of precarious housing

1990

CBTU :: São Caetano - Luz

Infrastructure recovery works between São Caetano and Luz Station, in São Paulo - SP

1987

CBTU :: Railway Yard

Construction of a railway yard for CBTU, in the Guaianazes district of São Paulo - SP

1985

PMSP :: Nove de Julho Avenue

Execution of drainage works on Nove de Julho Avenue, in the city of São Paulo - SP

1972

CHERP :: Anhembi Dam

Construction of the bridge and dam in Anhembi – SP

1969

For over 55 years, TELAR has led the way in pioneering civil construction in Brazil.

Telar Engenharia has operated for more than five decades with technical excellence and a strong commitment to the country’s development. Recognized for its role in major infrastructure and urban mobility projects, the company stands out for its use of advanced technologies, particularly in trenchless methods such as Tunnel Liner, used in road tunnels, drainage systems, and sanitation works.

With a solid presence in both public and private sectors, Telar actively engages in concessions and partnerships with public administrations, with a strong focus on sanitation and transportation. Its pioneering approach led to the creation of the first association of private water and sewage concessionaires in Brazil, reflecting the technical and organizational strength that has sustained the company over the years.

Telar values the qualifications of its team and continuously invests in solutions that combine innovation, efficiency, and social responsibility. With proven experience and a commitment to client interests, the company remains rooted in engineering, delivering solutions that drive progress and strengthen national infrastructure.

OUR VALUES

Our values guide every decision, shaping our relationships, professional conduct, and the way we deliver results with responsibility and integrity. They are present in all our actions, reflecting Telar’s culture in every project.

People
Valuing the Human Being

Our greatest asset is our people. We prioritize health, safety, and well-being, recognizing committed, respected, and motivated professionals who build Telar’s history every day with skill and responsibility.

Customer
Satisfaction

We strive for complete customer satisfaction, with excellent service, effective technical solutions, and ethical conduct, fostering trust-based relationships and delivering consistent results across all projects.

Quality and
Valuing Knowledge

We operate with technical and organizational excellence, investing in knowledge, training, and continuous improvement to ensure high-quality, responsible, and results-driven engineering deliveries.

Innovation
and Technology

We are at the forefront of engineering, with proven innovation capacity through methods such as Tunnel Liner. We apply cutting-edge technologies and continually refine our processes to deliver efficient and safe solutions.

Sustainability
and Development

We are committed to sustainability, ensuring longevity, job creation, economic growth, and socio-environmental respect. We act responsibly to contribute to the development of the country and the industry.

MANAGERS

Marco Antonio Botter

Managing director

Bachelor in Civil Engineering by Poli USP, Graduate in Quantitative Methods by FGV

Mauro Silvestre Leite

Superintendent director

Bachelor in Civil Engineering by Poli USP

Telmo Giolito Porto

new business director

New Business Director from 2015 to 2023. In Memoriam

Rodrigo Botter Rios Pinto

administrative director

Bachelor in Civil Engineering by Poli USP, Graduate in Corporate Finance by FGV

Octavio Ferreira Mendes

commercial manager

Bachelor in Mechanical Engineering by Univ. Mackenzie

QUICK ACCESS